STATUS OF DESILTING WORKS IN INDUSTRIAL AREAS
AS ON 28-06-2017


S. No. Name of Drain/ Industrial Area Length of Drain Name of Contractor/Agency Awarded amount Name & Designation of the Engineering-in-charge Date of Start Target date fixed for Completion Estimated quantity of silt to be removed Physical Progress of work as on date Photographs
1. Wazirpur Industrial Area 19.778 M/s Saini Enterprises Rs.4328303.63 Sh. M.P. Singh, E.E.(9871479873) 1.6.2017 30.6.2017 7698.27cum 35% Photo
2. Badli Industrial Area Phase I, II, III & IV 9.672 M/s Saini Enterprises Rs.2297923.64 Sh. M.P. Singh, E.E.(9871479873) 1.6.2017 30.6.2017 3691.31cum 35% Photo
3. Kirti Nagar Industrial Area 18.72 M/s K.S. Builders Rs.1857548.54 Sh. M.P. Singh, E.E.(9871479873) 1.6.2017 30.6.2017 3261.87cum 25% Photo
4. Nangloi Industrial Area 4.584 M/s Arun Infra Rs.682023.12 Sh. M.P. Singh, E.E.(9871479873) 1.6.2017 30.6.2017 1154.25cum 35% Photo
5. Mayapuri Industrial Area Phase-I 1.7 M/s Arun Infra Rs.383804.52 Sh. M.P. Singh, E.E.(9871479873) 1.6.2017 30.6.2017 625.89cum 50% Photo
6. Mayapuri Industrial Area Phase-II 2.07 M/s Arun Infra Rs.741451.55 Sh. M.P. Singh, E.E.(9871479873) 1.6.2017 30.6.2017 1231.94cum 52% Photo
7. Mangolpuri Phase- I & II 14.128 M/s K.S. Builders Rs.1154368.15 Sh. M.P. Singh, E.E.(9871479873) 1.6.2017 30.6.2017 2286.00cum 25% Photo
8. GTK Industrial Area 9.352 M/s Arun Infra Rs.965065.94 Sh. M.P. Singh, E.E.(9871479873) 1.6.2017 30.6.2017 1789.52cum 42% Photo
9. Udyog Nagar Industrial Area 9.081 M/s R.K.Enterprises Rs.1353764.69 Sh. M.P. Singh, E.E.(9871479873) 1.6.2017 30.6.2017 2405.41cum 25% Photo
10. Patparganj Industrial Area 13.475 M/s Saini Enterprises Rs.1472293.00 A.K. Mishra, EE (9310169858) 1.6.2017 30.6.2017 1600cum 15.60% Photo
11. Jhilmil Industrial Area (A&B Block) 8.427 M/s Arun Infra Rs.1333751.00 Sh. M.P. Singh, E.E.(9871479873) 1.6.2017 30.6.2017 2119.09cum 35% Photo
12. Naraina Industrial Area Ph-I & II 5.866 M/s Arun Infra Rs.1024283.00 Sh.S.P.Singh, EE 9891349815 1.6.2017 30.6.2017 1736.51 cum 40% Photo
13. Rajasthani Udyog Nagar Industrial Area 3.619 M/s Arun Infra Rs.378335.00 Sh.S.P.Singh, EE 9891349815 1.6.2017 30.6.2017 659.85cum 33% Photo
14. Okhla Industrial Estate Ph-III Pipe drain 7.800 Open drain 0.600 M/s Prabh Infra Rs.782403.00 Sh.S.P.Singh, EE 9891349815 1.6.2017 30.6.2017 248 cum for open drain only 25% Photo
15. Lawrence Road Industrial Area 7.5 km M/s. Gangotri Enterprises Sh.S.P.Singh, EE 9891349815 The work of redevelopment of roads and drains is under progress. The agency shall be looked after the desilting work also.
16. Narela Industrial Area 35 km M/s. PNC Delhi Industrialinfra Pvt. Ltd. Sh. P.K. Sharma, EE 9871647501 The concessionaire is maintaining the whole Industrial Area as per the Concession Agreement and this is a continuous process for cleaning of drains. Anywhere anytime if there is a problem of blockage of drain; the same is being attended by the Concessionaire within four hours time.
17. Bawana Industrial Area 256 km M/s. Bawana infra Development (P) Ltd. Sh. P.K. Sharma, EE 9871647501 The concessionaire is maintaining the whole Industrial Area as per the Concession Agreement and this is a continuous process for cleaning of drains. Anywhere anytime if there is a problem of blockage of drain; the same is being attended by the Concessionaire within four hours time.
18. DSIIDC Shed Nangloi Industrial Area These are Flatted Factory Complexes and no major drains are there for desilting. There are minor drains in these Flatted Factory Complexes and small drains are cleaned on daily wages.
19. Flatted Factory Complex Jhilmil Industrial Area These are Flatted Factory Complexes and no major drains are there for desilting. There are minor drains in these Flatted Factory Complexes and small drains are cleaned on daily wages.
20. D.L.F. Industrial Area Moti Nagar These are Flatted Factory Complexes and no major drains are there for desilting. There are minor drains in these Flatted Factory Complexes and small drains are cleaned on daily wages.
21. Najaphgarh Road Industrial Area These are Flatted Factory Complexes and no major drains are there for desilting. There are minor drains in these Flatted Factory Complexes and small drains are cleaned on daily wages.